Canal - Water way.
Canal or Water way.
I've found one of the best ways to get nice straight lines for the water-way is to use part of the Road.
Getting the Tunnel in to the mountain.
But you need to make it smaller. (in hight)
First you need to lower the ground to the required hight?
(This is trial-and-error)
Then position your track piece.
(This is whare your road markings come in, To help aline the track.)
You will not see the Track until you set the Tarrain Transparency.
From here you can push the track further in to the mountain/hill.
If the hight is not correct (Tarrain Transparency)
you will have to delete the track & re-adjust the ground.
Do not
Don't try to lift the track from now on, all it will do is lift it to the ground leval. pic D #2
If your happy with the positioning, then its time to put in the sides, and get rid of the road lines.
It's all up to you & your imagination now.
Just one more thing i prefer to use the big wide wall it covers more of the mistakes.
pic D #3 & #4
pic D
PS.
PPS.
PSS. or what ever,
Someone asked me Y the workmen, hut & digger/excavator ?
Well who do you think constructed it,
"Not me i was putting these damn web pages together."











